{{ variable.name }}
Three-winding oil-immersed power transformer for utility-scale battery energy storage grid interconnection · 225 MVA · 230 kV to 69 kV

This 225 MVA three-winding substation power transformer links a 69 kV energy storage substation bus to a 230 kV transmission grid. The unit is specified for bidirectional power transfer: it carries power into the battery system while the batteries charge and returns it to the grid while they discharge. It belongs to the Winley Electric high-voltage power transformer range covering 31.5 MVA to 1000 MVA and up to 1000 kV, and is engineered to project-specific electrical, thermal and mechanical requirements, with routine and project-specified factory acceptance tests before shipment.
| Rated capacity | 225 MVA, three-winding |
| Voltage ratio | 230 kV to 69 kV |
| Winding configuration | Three-winding; two-winding and auto-transformer configurations available |
| Cooling methods | ONAN / ONAF / OFAF / ODAF |
| Core | Grain-oriented silicon steel |
| Conductors | Copper or aluminum, precision wound |
| Tap changing | On-load tap changer (OLTC) or de-energized tap changer (DETC) |
| Protection accessories | Buchholz relay, pressure relief device, winding and oil temperature indicators |
| Standards | ANSI/IEEE C57, CSA C88, AS 60076, IEC 60076, DOE efficiency |
| Factory testing | Routine and project-specified acceptance tests with serialized reports |
| Typical lead time | 10 to 20 weeks, depending on capacity, voltage class and customization |
| Warranty | 24 months from B/L date, extendable up to 5 years on project request |
The three-winding configuration can be delivered as a two-winding or auto-transformer arrangement when the project single-line diagram calls for it, in three-phase or single-phase format. Tap changing is available as OLTC or DETC, and the unit can be supplied with conservator or sealed-tank construction, porcelain or polymer bushings, HV and LV air terminal chambers, throat connections and a tank footprint matched to the civil layout of the storage site.
The magnetic circuit uses grain-oriented silicon steel; windings are precision wound in copper or aluminum; the tank, cooling equipment and oil-immersed cooling system are built around the thermal and mechanical duty of the site. Protection and monitoring devices are integrated into the structure so that gas accumulation, tank pressure and winding and oil temperatures can be supervised during unattended operation.
Utility-scale battery energy storage grid interconnection, renewable energy integration, peak shaving, grid stabilization, transmission substations and utility grid capacity projects where a 230 kV to 69 kV transformation stage is required.
Winding conductor material, cooling class, tap changer type, bushing type, tank dimensions, protection and monitoring package, compliance standard set and the factory acceptance test plan are defined per project. Drawings, accessory selection and test schedules are agreed before production starts.
Project: one 225 MVA, 230 kV to 69 kV three-winding power transformer for a utility-scale BESS grid interconnection in the United States. The unit connects the 69 kV energy storage substation system to the 230 kV transmission grid and supports bidirectional power transfer during battery charging and discharging, for an expected 30-year service life.
Scope covered large-scale energy storage integration, peak shaving and grid stabilization. The flexible cooling configuration accommodates varying power demand across charge and discharge cycles; the electrical and thermal design targets reduced energy losses and controlled operating temperatures; integrated monitoring and protection support safe operation and simplified maintenance.
Can the transformer handle bidirectional power flow?
Yes. The unit is specified for bidirectional power transfer, covering charging and discharging operation of the battery system.
Which standards can the design follow?
ANSI/IEEE C57, CSA C88, AS 60076, IEC 60076 and DOE efficiency requirements, as named in the project specification.
What is the typical lead time?
10 to 20 weeks depending on capacity, voltage class and custom specifications.
Are factory tests documented?
Every unit goes through routine and project-specified factory acceptance tests with serialized test reports prior to shipment.
What protection devices are available?
Buchholz relay, pressure relief device and winding and oil temperature indicators, integrated in the monitoring package.
What warranty applies?
24 months from the Bill of Lading date as standard, extendable up to 5 years on project request.
Send the single-line diagram, rated capacity, voltage class, cooling preference, applicable standard and site conditions for a project-specific quotation.
Xiamen Winley Electric Co.,Ltd · No. 99 Yilan Road, Siming, Xiamen, Fujian, China
Email: steven@winley-electric.com · Tel: 86-18650108051 · WhatsApp: +8618650108051
Management systems certified to ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018, scope covering the full product range.

225mva-three-winding-power-transformer-230kv-bess-tank-side.jpg

225mva-three-winding-power-transformer-230kv-bess-bushing-detail.png