Verified Project Achievements

Project Cases

Explore our proven track record of delivering high-quality transformers for diverse applications worldwide.

4+Verified cases
2Countries & regions
4Application sectors
100%On-time delivery

Customer Success Stories

Filter by industry, market or product type to find a comparable implementation.

4 cases shown
HN
This 6500kVA oil-immersed step-up transformer is mainly applied to the supporting step-up substation of large-scale ground-mounted solar power plants in Honduras. It steps up the low-voltage power collected by photovoltaic modules to the grid-compatible voltage to realize safe and stable grid connection and transmission of clean energy, optimize power quality, adapt to local grid operation specifications, and ensure long-term reliable operation of the entire solar power system.Product

Energy Enterprise

1.Achieved ultra-fast delivery in 7 weeks, 5–9 weeks shorter than the industry average of 12–16 weeks, improving efficiency by over 40%. 2.Supplies about 10MW clean power to southern Honduras, alleviating power shortage and promoting energy transition. 3.Low loss, high reliability, long-term stable operation, reducing operation cost of the power station.

2 unitsQuantity
20 yearsDuration
US
1. Large Commercial & Retail Complexes 2. Data Centers (Edge & Mid-Scale) 3. Industrial Manufacturing & Logistics 4. Renewable Energy & EV Infrastructure 5. Multi-Family Residential & MicrogridsProduct

Electricity Utility Company

Winley Electric successfully completed the production of 31 units of three-phase pad mounted transformers for a North American client, covering two core specifications: 2550kVA and 3750kVA, with high-voltage ratings of 34.5kV and 12.87kV. This batch production, completed efficiently within the agreed timeframe, fully demonstrates Winley Electric’s strong mass production capacity and high production efficiency—we can simultaneously handle the production of multiple specifications of transformers in large quantities, strictly control production cycles, and ensure on-time delivery without compromising quality. It is worth noting that Winley Electric’s entire series of three-phase pad mounted transformers have obtained UL and CUL certifications, fully complying with North American safety and quality standards. The entire production process of these 31 units was carried out in strict accordance with the client’s actual application scenarios and North American industry standards, solving the client’s key concerns in procurement and delivering a reliable power distribution solution that meets their on-site needs.

31 unitsQuantity
20Duration
US
Grid Modernization and Renovation of Aging SubstationsProduct

Utility Company

Across North America, aging grid infrastructure, surging municipal power demand, renewable energy interconnection and regional load expansion have created severe supply shortages for large-capacity substation power transformers. Local North American manufacturers face extreme production backlogs, with lead times for 30–50 MVA liquid-filled substation transformers often extending beyond 100 weeks. These prolonged lead times cause widespread project delays, construction holdups and urgent equipment gaps for U.S. utility and grid upgrade clients. To address these pain points for a U.S. utility client, Winley Electric delivered two 40 MVA conservator-type liquid-filled step-down substation power transformers, focusing on fast delivery, reliable performance, and tailored logistics support.​The entire in-house production and testing cycle was completed in 12 weeks, effectively solving the client’s urgent need to avoid project delays. ​

2 unitsQuantity
30Duration
No matching cases. Try changing the filters.

Have a Similar Project?

Share your site conditions, required dimensions and application. Our engineering team will recommend a comparable solution.

Project Case