🌍 Winley Electric Since 2014 ⭐ 12+ Year Industry Experience ✓ Verified Elite Supplier
✓ Verified Elite Supplier
Menu
Winley Electric
Verified Elite Supplier
Winley Electric
China

Annual Output
35,000 units
Total Employees
220
Business Type
Electrical & Electronics

Share Us Via

10-14 MVA Industrial Substation Transformer 2.4kV and 4.16kV Multi-Feeder

Quantity:
SKU: 4923904526
Model: Substation & Power Transformers

{{ variable.name }}

{{ value.name }}
SEO Title: 10-14 MVA Industrial Substation Transformer 2.4 kV and 4.16 kV Multi-Feeder. Meta Description: 10-14 MVA industrial substation transformer with Dd0y1y1 multi-secondary design, multiple 2.4 kV and 4.16 kV feeders, ANSI/IEEE compliant for plant motor loads. URL Slug: /10-14-mva-industrial-substation-transformer-2-4kv-4-16kv-multi-feeder

10-14 MVA Industrial Substation Transformer 2.4kV and 4.16kV Multi-Feeder

Dd0y1y1 multi-secondary substation transformer for large industrial plants · 10 to 14 MVA · multiple 2.4 kV and 4.16 kV outputs

10 MVA industrial substation transformer with multiple 2.4 kV and 4.16 kV secondary outputs built for a US EPC substation project

Product Summary

This 10 to 14 MVA three-phase substation transformer is built for large industrial substations that need several medium-voltage feeders from one platform. A Dd0y1y1 winding arrangement provides multiple 2.4 kV and 4.16 kV secondary outputs for medium-voltage motors and process loads, so a single transformer can support more than one distribution bus. It sits inside the substation transformer range of 150 kVA to 50 MVA and 2.4 kV to 69 kV, engineered to ANSI/IEEE C57, CSA C88, AS 60076, IEC 60076 and DOE efficiency requirements, with routine and project-specified factory acceptance tests before shipment.

Key Features

Dd0y1y1 Multi-Secondary Winding
Multiple 2.4 kV and 4.16 kV outputs from one transformer, matching plants with several medium-voltage distribution buses.
10 to 14 MVA Custom Capacity
Capacity is set for the connected motor and process load instead of a catalogue size that forces over- or under-sizing.
Motor and Process Load Duty
Designed for industrial substations feeding medium-voltage motors, drives and process equipment.
Grain-Oriented Silicon Steel Core
Low no-load loss design with precision-wound copper or aluminum windings for low load losses.
ONAN ONAF OFAF ODAF Cooling
Cooling class is selected against the plant duty cycle and the available space in the substation yard.
ANSI/IEEE Industrial Substation Design
Bushing arrangements, air terminal chambers and throat connections are configured for industrial substation layouts.

Technical Specifications

Rated capacity10 to 14 MVA, project specific (substation range 150 kVA to 50 MVA)
Winding configurationDd0y1y1, multi-secondary
Secondary outputsMultiple 2.4 kV and 4.16 kV feeders
Primary voltageProject specified, within the 2.4 kV to 69 kV substation class range
Cooling methodsONAN / ONAF / OFAF / ODAF
Tap changingOn-load tap changer (OLTC) or de-energized tap changer (DETC)
Core and conductorsGrain-oriented silicon steel core; copper or aluminum windings
Interface optionsHV and LV bushing arrangements, air terminal chambers, throat connections
StandardsANSI/IEEE C57, CSA C88, AS 60076, IEC 60076, DOE efficiency
Factory testingRoutine and project-specified acceptance tests with serialized reports
Typical lead time10 to 20 weeks, depending on capacity, voltage class and customization
Warranty24 months from B/L date, extendable up to 5 years on project request

Models and Options

The multi-secondary platform can be configured with different secondary voltage combinations, tap changer type (OLTC or DETC), bushing material and arrangement, air terminal chamber geometry and tank footprint. Two-winding and three-winding arrangements are also available when the plant distribution study calls for a simpler secondary side.

Materials and Structure

Grain-oriented silicon steel cores and precision-wound copper or aluminum conductors form the active part, housed in a steel tank with oil-immersed cooling. Buchholz relay, pressure relief device and winding and oil temperature indicators are available as part of the protection and monitoring package for industrial substation operation.

Applications

Large industrial substations supplying medium-voltage motors and process loads, plant service entrances, production line distribution buses, industrial park distribution and retrofit projects where one platform feeds several medium-voltage buses.

Customization

Capacity between 10 and 14 MVA, secondary voltage combinations, winding arrangement, cooling class, tap changer, bushing and terminal chamber design and the factory acceptance test plan are agreed with the buyer before production, based on the plant load list and single-line diagram.

Case Study

Project: two 10 to 14 MVA custom substation transformers for a US engineering, procurement and construction contractor, built for large industrial substations requiring multiple 2.4 kV and 4.16 kV secondary feeders for medium-voltage motors and process loads.

Both units were manufactured within a 9-week production cycle. The Dd0y1y1 winding configuration provides multiple 2.4 kV and 4.16 kV secondary outputs, and one transformer platform supports multiple medium-voltage distribution buses and industrial loads, engineered to ANSI/IEEE industrial substation practice.

FAQ

What does the Dd0y1y1 design give my plant?

One transformer platform with multiple 2.4 kV and 4.16 kV secondary outputs, feeding more than one medium-voltage distribution bus for motors and process loads.

Is the capacity fixed at 10 MVA?

No. Units in this family are built between 10 and 14 MVA according to the project load list, inside the 150 kVA to 50 MVA substation transformer range.

Which standards are used?

ANSI/IEEE C57 and CSA C88 for North American projects, AS 60076 and IEC 60076 internationally, plus DOE efficiency requirements.

Which tap changer can be supplied?

Either an on-load tap changer (OLTC) or a de-energized tap changer (DETC), selected against the plant voltage regulation practice.

What lead time should we plan for?

Typical lead time is 10 to 20 weeks depending on capacity, voltage class and customization; the two 10 to 14 MVA units in the referenced project were produced in a 9-week production cycle.

Are test reports provided before shipment?

Yes. Routine and project-specified factory acceptance tests are completed and serialized test reports accompany each unit.

Inquiry Information

Send the plant load list, required secondary voltages, primary voltage class, cooling preference and applicable standard to receive a project-specific configuration and quotation.

Xiamen Winley Electric Co.,Ltd · No. 99 Yilan Road, Siming, Xiamen, Fujian, China

Email: steven@winley-electric.com · Tel: 86-18650108051 · WhatsApp: +8618650108051

Management systems certified to ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018, scope covering the full product range.

Image Filename and Alt Suggestions

Tank and bushing detail of a 10 to 14 MVA multi-secondary industrial substation transformer

10mva-industrial-substation-transformer-2-4kv-4-16kv-tank-detail.jpg