{{ variable.name }}
Dd0y1y1 multi-secondary substation transformer for large industrial plants · 10 to 14 MVA · multiple 2.4 kV and 4.16 kV outputs

This 10 to 14 MVA three-phase substation transformer is built for large industrial substations that need several medium-voltage feeders from one platform. A Dd0y1y1 winding arrangement provides multiple 2.4 kV and 4.16 kV secondary outputs for medium-voltage motors and process loads, so a single transformer can support more than one distribution bus. It sits inside the substation transformer range of 150 kVA to 50 MVA and 2.4 kV to 69 kV, engineered to ANSI/IEEE C57, CSA C88, AS 60076, IEC 60076 and DOE efficiency requirements, with routine and project-specified factory acceptance tests before shipment.
| Rated capacity | 10 to 14 MVA, project specific (substation range 150 kVA to 50 MVA) |
| Winding configuration | Dd0y1y1, multi-secondary |
| Secondary outputs | Multiple 2.4 kV and 4.16 kV feeders |
| Primary voltage | Project specified, within the 2.4 kV to 69 kV substation class range |
| Cooling methods | ONAN / ONAF / OFAF / ODAF |
| Tap changing | On-load tap changer (OLTC) or de-energized tap changer (DETC) |
| Core and conductors | Grain-oriented silicon steel core; copper or aluminum windings |
| Interface options | HV and LV bushing arrangements, air terminal chambers, throat connections |
| Standards | ANSI/IEEE C57, CSA C88, AS 60076, IEC 60076, DOE efficiency |
| Factory testing | Routine and project-specified acceptance tests with serialized reports |
| Typical lead time | 10 to 20 weeks, depending on capacity, voltage class and customization |
| Warranty | 24 months from B/L date, extendable up to 5 years on project request |
The multi-secondary platform can be configured with different secondary voltage combinations, tap changer type (OLTC or DETC), bushing material and arrangement, air terminal chamber geometry and tank footprint. Two-winding and three-winding arrangements are also available when the plant distribution study calls for a simpler secondary side.
Grain-oriented silicon steel cores and precision-wound copper or aluminum conductors form the active part, housed in a steel tank with oil-immersed cooling. Buchholz relay, pressure relief device and winding and oil temperature indicators are available as part of the protection and monitoring package for industrial substation operation.
Large industrial substations supplying medium-voltage motors and process loads, plant service entrances, production line distribution buses, industrial park distribution and retrofit projects where one platform feeds several medium-voltage buses.
Capacity between 10 and 14 MVA, secondary voltage combinations, winding arrangement, cooling class, tap changer, bushing and terminal chamber design and the factory acceptance test plan are agreed with the buyer before production, based on the plant load list and single-line diagram.
Project: two 10 to 14 MVA custom substation transformers for a US engineering, procurement and construction contractor, built for large industrial substations requiring multiple 2.4 kV and 4.16 kV secondary feeders for medium-voltage motors and process loads.
Both units were manufactured within a 9-week production cycle. The Dd0y1y1 winding configuration provides multiple 2.4 kV and 4.16 kV secondary outputs, and one transformer platform supports multiple medium-voltage distribution buses and industrial loads, engineered to ANSI/IEEE industrial substation practice.
What does the Dd0y1y1 design give my plant?
One transformer platform with multiple 2.4 kV and 4.16 kV secondary outputs, feeding more than one medium-voltage distribution bus for motors and process loads.
Is the capacity fixed at 10 MVA?
No. Units in this family are built between 10 and 14 MVA according to the project load list, inside the 150 kVA to 50 MVA substation transformer range.
Which standards are used?
ANSI/IEEE C57 and CSA C88 for North American projects, AS 60076 and IEC 60076 internationally, plus DOE efficiency requirements.
Which tap changer can be supplied?
Either an on-load tap changer (OLTC) or a de-energized tap changer (DETC), selected against the plant voltage regulation practice.
What lead time should we plan for?
Typical lead time is 10 to 20 weeks depending on capacity, voltage class and customization; the two 10 to 14 MVA units in the referenced project were produced in a 9-week production cycle.
Are test reports provided before shipment?
Yes. Routine and project-specified factory acceptance tests are completed and serialized test reports accompany each unit.
Send the plant load list, required secondary voltages, primary voltage class, cooling preference and applicable standard to receive a project-specific configuration and quotation.
Xiamen Winley Electric Co.,Ltd · No. 99 Yilan Road, Siming, Xiamen, Fujian, China
Email: steven@winley-electric.com · Tel: 86-18650108051 · WhatsApp: +8618650108051
Management systems certified to ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018, scope covering the full product range.

10mva-industrial-substation-transformer-2-4kv-4-16kv-tank-detail.jpg